What does the system implementation process look like?
We approach each facility individually, conducting a detailed analysis of its needs and specific requirements to ensure the most effective solution.
The implementation process is carried out through two key stages: system sizing and modular implementation.
Precise System Sizing Based on the Facility's Size and Specific Requirements
Our experts, in collaboration with fire protection, occupational safety, and security specialists, analyze evacuation routes to ensure an efficient evacuation process.
During system sizing, we follow autonomy and fire-resistance criteria for the infrastructure as well as by the definition of the evacuation team and internal evacuation protocols, in order to ensure sufficient time for safe evacuation.
This individualized approach ensures an optimally sized system tailored to the actual needs of the facility and the personnel responsible for evacuation management.
Facility complexity
Size, purpose, and the number of occupants.
Evacuation requirements
The time required for safe evacuation, the response time of the evacuation team, and staffing capacities in line with assessed evacuation needs.
Modular implementation
Based on the jointly defined system sizing requirements, the equipment is designed and configured into a unified system that delivers the required level of evacuation efficiency. Depending on the facility's needs, implementation can include a single infrastructure component or a combination of multiple components.
The implementation of the Wiz application provides enhanced and efficient evacuation management through:
- Alarm activation in emergency situations
- Navigation and orientation using floor plans
- Rapid evacuation instructions and evacuation team coordination
- Reporting injuries or inability to self-evacuate
- Employee training through evacuation drills
- Real-time information sharing with emergency response services
Additional Implementation of Dynamic Signage:
- Dynamic signage instead of static signs
- Evacuation routes based on predefined scenarios
- Rapid adjustment of evacuation routes according to the situation
Additional Implementation of Display Screens:
- Facility floor plans with all critical information
- Visualization of evacuation routes and incident locations
- Dynamically guided evacuation with instructions from the evacuation manager and their team